Owner-supplied photographs
One doorway, four stages
Follow the same timber doorway through preparation, a white coating stage and an olive finish.
Kian visits, looks at the surfaces and gives you a written quote. Fitzroy painters since May 2014 · Public Liability Insured.

What the photographs show
The sequence shows one doorway at four points in the work. In the first photograph, filling and preparation had already started: this is before final painting, not a record of the untouched original condition.
The next frame shows exposed timber around the doors and frame. A later photograph shows a white coating, followed by olive-coloured doors against white framing. The photographs do not identify the coating product or prove how many coats were applied.
The final photograph records the painted doors, not a completed property handover: the glazing and the courtyard beyond have not been cleaned. Each frame is shown separately so you can inspect the actual stages without an artificially aligned before-and-after slider.
Project suburb, date, products and price are not recorded. These are on-site photos supplied by Kian, not a claim about work at a particular address. Photos are resized for the web; where cropped, the full photo is linked.

Before final paintingFull photo 
Timber preparationFull photo 
White coating stageFull photo 
Olive door finishFull photo